This help topic is for R version 2.9.0. For the current version of R, try https://stat.ethz.ch/R-manual/R-patched/library/base/html/seq.Date.html
seq.Date {base}R Documentation

Generate Regular Sequences of Dates

Description

The method for seq for objects of class class "Date" representing calendar dates.

Usage

## S3 method for class 'Date'
seq(from, to, by, length.out = NULL, along.with = NULL, ...)

Arguments

from

starting date. Required

to

end date. Optional.

by

increment of the sequence. Optional. See ‘Details’.

length.out

integer, optional. desired length of the sequence.

along.with

take the length from the length of this argument.

...

arguments passed to or from other methods.

Details

by can be specified in several ways.

Value

A vector of class "Date".

See Also

Date

Examples

## first days of years
seq(as.Date("1910/1/1"), as.Date("1999/1/1"), "years")
## by month
seq(as.Date("2000/1/1"), by="month", length.out=12)
## quarters
seq(as.Date("2000/1/1"), as.Date("2003/1/1"), by="3 months")

## find all 7th of the month between two dates, the last being a 7th.
st <- as.Date("1998-12-17")
en <- as.Date("2000-1-7")
ll <- seq(en, st, by="-1 month")
rev(ll[ll > st & ll < en])

[Package base version 2.9.0 ]